• <ins id="guwtm"><option id="guwtm"></option></ins>
  • <tr id="guwtm"></tr>
  • 無錫中科電氣設備有限公司

    Zhongke Electrical

    • Home
    • About
      • About company
      • Organization
      • Chairman's speech
      • corporate culture
    • Products
      • system integration
      • High and low voltage switch cabinet
      • Power quality control
      • Marine electrical and automation control
      • Open-pit mine works
    • QA
      • Company qualification
      • Product qualification
      • BV factory accreditation certificate
    • Classic
      • system integration
      • High and low voltage switch cabinet
      • Power quality control
      • Marine electrical and automation control
      • Open-pit mine works
    • achievement
      • Automated performance
      • Distribution results
      • Install the performance
      • Cement industry performance
    • News
    • Contact
    • 中文
    • English
    • Home
    • About
      • About company
      • Organization
      • Chairman's speech
      • corporate culture
    • Products
      • system integration
      • High and low voltage switch cabinet
      • Power quality control
      • Marine electrical and automation control
      • Open-pit mine works
    • QA
      • Company qualification
      • Product qualification
      • BV factory accreditation certificate
    • Classic
      • system integration
      • High and low voltage switch cabinet
      • Power quality control
      • Marine electrical and automation control
      • Open-pit mine works
    • achievement
      • Automated performance
      • Distribution results
      • Install the performance
      • Cement industry performance
    • News
    • Contact
    • 中文
    • English
    achievement
    Install the performance
    Home/ achievement/ Install the performance
    Install the performance
    Localhost: Home / achievement/ Install the performance
    • Shanxi holsich coal co. LTD The holsinh mine coal preparation plant collection control system project

      11-06

      Shanxi holsich coal co. LTD The holsinh mine coal preparation plant collection control system project

      Go Back Next: Electrical system project of coal preparation plant of yangpo spring coal mine in Shanxi Province
    • Electrical system project of coal preparation plant of yangpo spring coal mine in Shanxi Province

      11-06

      Electrical system project of coal preparation plant of yangpo spring coal mine in Shanxi Province

      Previou: Shanxi holsich coal co. LTD The holsinh mine coal preparation plant collection control system project Go Back Next: Jinfeng branch plant control system and transformer distribution installation of shenhuining coal group ningdong coal mine
    • Jinfeng branch plant control system and transformer distribution installation of shenhuining coal group ningdong coal mine

      11-06

      Jinfeng branch plant control system and transformer distribution installation of shenhuining coal group ningdong coal mine

      Previou: Electrical system project of coal preparation plant of yangpo spring coal mine in Shanxi Province Go Back Next: Ordos city xinjuyuan chemical co., LTD. Electrical system installation project
    • Ordos city xinjuyuan chemical co., LTD. Electrical system installation project

      11-06

      Ordos city xinjuyuan chemical co., LTD. Electrical system installation project

      Previou: Jinfeng branch plant control system and transformer distribution installation of shenhuining coal group ningdong coal mine Go Back Next: Installation of electrical equipment and collection control system of huaigren terminal, shenyang hospital
    • Installation of electrical equipment and collection control system of huaigren terminal, shenyang hospital

      11-06

      Installation of electrical equipment and collection control system of huaigren terminal, shenyang hospital

      Previou: Ordos city xinjuyuan chemical co., LTD. Electrical system installation project Go Back Next: Installation of electrical equipment and collection control system of coal preparation plant of shanxi calabash energy investment co., LTD
    • Installation of electrical equipment and collection control system of coal preparation plant of shanxi calabash energy investment co., LTD

      11-06

      Installation of electrical equipment and collection control system of coal preparation plant of shanxi calabash energy investment co., LTD

      Previou: Installation of electrical equipment and collection control system of huaigren terminal, shenyang hospital Go Back Next: Qinghai haiyan coal preparation plant collecting control system, low voltage distribution, lighting installation
    • Qinghai haiyan coal preparation plant collecting control system, low voltage distribution, lighting installation

      11-06

      Qinghai haiyan coal preparation plant collecting control system, low voltage distribution, lighting installation

      Previou: Installation of electrical equipment and collection control system of coal preparation plant of shanxi calabash energy investment co., LTD Go Back Next: Yancoal heze can be used to install the coal flotation control system in zhaolou coal mine
    • Yancoal heze can be used to install the coal flotation control system in zhaolou coal mine

      11-06

      Yancoal heze can be used to install the coal flotation control system in zhaolou coal mine

      Previou: Qinghai haiyan coal preparation plant collecting control system, low voltage distribution, lighting installation Go Back Next: Yanzhou mining group dagong gas station instrument cabinet
    • Yanzhou mining group dagong gas station instrument cabinet

      11-06

      Yanzhou mining group dagong gas station instrument cabinet

      Previou: Yancoal heze can be used to install the coal flotation control system in zhaolou coal mine Go Back Next: Low - voltage bus bridge bus bridge in shanxi temple
    • Low - voltage bus bridge bus bridge in shanxi temple

      11-06

      Low - voltage bus bridge bus bridge in shanxi temple

      Previou: Yanzhou mining group dagong gas station instrument cabinet Go Back Next: Shandong linyi jiangshun mining co., LTD
    • Shandong linyi jiangshun mining co., LTD

      11-06

      Shandong linyi jiangshun mining co., LTD

      Previou: Low - voltage bus bridge bus bridge in shanxi temple Go Back Next: Wang zhuang coal preparation plant of lu 'an mining bureau (general contracting project)
    • Wang zhuang coal preparation plant of lu 'an mining bureau (general contracting project)

      11-06

      Wang zhuang coal preparation plant of lu 'an mining bureau (general contracting project)

      Previou: Shandong linyi jiangshun mining co., LTD Go Back
    • ?
    • ?
    • 1
    • 2
    • ?
    • ?
  • Automated performance
  • Distribution results
  • Install the performance
  • Cement industry performance
  • Company address: Furong two Road No. 298, Xishan Economic Development Zone, Wuxi, Jiangsu

    Tel: 0510-85100596
    Fex: 0510-85131599
    Website: www.fwasi.com
    E-mail: wxzk@vip.sina.com

    Company address: Furong two Road No. 298, Xishan Economic Development Zone, Wuxi, Jiangsu | Tel: 0510-85100596

    Fax:0510-85131599 | Website: www.fwasi.com | Email:wxzk@vip.sina.com
    Design by Haizr
    CopyRight ? ZHONGKE ELECTRICAL

    蘇公網安備 32020502000063號

     
    蘇ICP備17060408號
    国产激情久久久久影院老熟女
  • <ins id="guwtm"><option id="guwtm"></option></ins>
  • <tr id="guwtm"></tr>